You need to sign in to do that
Don't have an account?

Data Loader changing the date!! (British Summer Time)
My csv has 2009-09-15 (or 15/09/2009 if I tick european date formats in Data Loader settings). Then I insert the csv but when I view the record it shows 14/09/2009. How can it change the date!!
Both my user and org are set up in the GMT (British Summer Time) time zone so I don't get it.
Also my PC is set to GMT with 'adjust for daylight saving' ticked.
British Summer Time ends on Oct 25 and if I put 26/10/2009 in the csv the date is not changed. It displays 26/10/2009 as it should do.