Amber090Amber090 

Schedule Reports

Hi- I need to schedule a report to run at noon, but the only available time is at 4pm.  How can I schedule my report at noon without disabling another scheduled report?
NagaNaga (Salesforce Developers) 
Hi Amber,

I dont think its a possible option

Consider the following when setting a report’s schedule:

We recommend that reports be scheduled during off-peak hours for performance reasons. Typically, off-peak hours are between 6 PM and 3 AM local time.

Scheduled reports run in the time zone of the user who set up the schedule. If you view and save a schedule in a time zone different from the one in which it was previously scheduled, the time slot could change.

A scheduled report is run and emailed within 30 minutes of its preferred start time.

For example, if the Time Zone field on your user record is set to Pacific Standard Time, and you schedule a report to run every day at 2:00 PM, then the report runs every day between 2:00 PM and 2:29 PM Pacific Standard Time. 

Best Regards
Naga Kiran