• Bruce Van Buren 8
  • NEWBIE
  • 5 Points
  • Member since 2018

  • Chatter
    Feed
  • 0
    Best Answers
  • 0
    Likes Received
  • 0
    Likes Given
  • 0
    Questions
  • 1
    Replies

I'm trying to test an Apex method that calls an @future method.  I looks like my testing works up until the point where the @future test is called.  The test checks some results from the @future method and it looks like they haven't been executed yet.

 

Does @future execute asyncronously in test mode?

 

If so, how does one test @future methods?